The Edjudina Project lies in the southern portion of the Laverton District, which is located around 700km north-east of Perth and hosts numerous major gold deposits, including Anglogold Ashanti’s Sunrise Dam >10 Moz gold mine, Saracen Mineral Holdings (ASX: SAR) >2 Moz Carosue Dam gold mine and Matsa Resources (ASX: MAT) >0.5 Moz Red October gold mine (Figure 1).

The Project consists of four granted exploration tenements (E31/1134, E31/1150, E39/1765 and E39/1882) and is located in the highly mineralised Laverton Tectonic Zone of the Eastern Goldfields Province of the Yilgarn Craton and is considered prospective for gold and nickel-copper mineralisation (Figure 1).

The core of the project covers a strike extent of approximately 29km within the Linden Terrain east of the Pinjin Fault over a north-northwest trending sequence of prospective greenstone and is immediately along strike from Matsa Resources’ Fortitude gold project (>385,000oz Au).

Previous work on the Edjudina tenure, mostly during the 1980’s and 1990’s, included soil sampling, geophysics (both airborne and ground-based), air core (AC) drilling and minimal reverse circulation (RC) drilling.

Several gold-in-soil anomalies were identified during previous exploration programs, in particular at two prospect locations, Hornet and Raptor (Figures 1, 2, 3 and 6). Both areas of soil anomalism were the subject of shallow AC drilling to the base of weathered rock and both demonstrated significant, lateral and strike extensive, unexplained transition gold anomalies.

Much of this exploration effort was undertaken at a time when the gold price was less than US$300/oz and therefore the hurdles to mining were much higher than today, with gold prices currently around US$1,500/oz.

Of particular interest is the Hornet Prospect, where two intervals at the transition from weathered rock to fresh rock, within what is logged as a mafic-rich variant of basement, remain open and unresolved (see Figures 2 & 3).

A small program of ineffective RC drilling was completed at Hornet but the holes drilled were testing a geophysical anomaly and missed the more prospective geochemical/geological targets.

The more prospective transition anomaly intersections included 1:

3m @ 1.6 g/t Au (from 41.0m to EOH in hole 1650/7250), including 1.0m @ 4.6 g/t Au
1.0m @ 2.0 g/t Au (from 47.0m in hole 1650/7247)

Shallow air-core drill testing at the Raptor prospect (Figure 6) demonstrated a potential relationship between surficial soil and transition bedrock gold anomalism with shallow AC drilling along the anomaly failing to penetrate below the transition into true fresh rock and failing to explain adequately the source of what is a very large, very continuous gold anomaly.

Figure 1: Regional location of the Edjudina Gold Project

Figure 2: Hornet Prospect surface geochemistry with historic AC and RC drill collars 1

  1. Drilling and assay data sourced from the Dept of Mines, Industry, Regulation and Safety (DMIRS) open file databases and reports submitted to the Western Australian Geological Survey.

Figure 6: Raptor Prospect surface geochemistry with historic AC drill collars 1

Figure 3: Hornet Prospect section 6,716,650mN (+/- 50m) 1